Networking

Structured Cabling

Professional structured cabling is the foundation of every reliable network. We design and install future-ready cabling systems using industry-leading Belden products and proven methodologies, built to BICSI and TIA/EIA standards for commercial, multifamily, and new construction properties across Austin, San Antonio, Dallas, and Houston.

What's Included

CAT6 & CAT6A Ethernet Cabling
Fiber Optic Installation & Splicing
Coaxial Cable Systems
A/V & Speaker Wiring
Security Camera Cabling
Access Control Wiring
Patch Panel Installation & Labeling
Cable Testing & Certification
Conduit & Raceway Installation
New Construction Pre-Wire
Renovation & Retrofit Cabling
Data Center Cabling

Technology Partners

BeldenPanduitCiscoUbiquiti

Frequently Asked Questions

What cabling standards does Gardient follow for structured cabling installations?

Gardient designs and installs structured cabling systems to BICSI and TIA/EIA standards, using Belden and Panduit components to ensure every run is tested, labeled, and certified for long-term reliability.

Does Gardient install both copper and fiber optic cabling?

Yes. Gardient installs CAT6 and CAT6A copper cabling as well as fiber optic cabling and splicing, and can design hybrid copper/fiber backbones for buildings that need both high-density ports and long-distance runs.

Can structured cabling be installed in an occupied building without major disruption?

Yes. For renovation and retrofit projects, Gardient schedules cable pulls and patch panel work around your operating hours and uses existing conduit and raceway paths where possible to minimize disruption to tenants or staff.

Does Gardient provide cable testing and certification after installation?

Every structured cabling installation includes cable testing and certification, with documented results for each run, so the property owner has a verified record of network performance at handoff.

How long does a typical structured cabling installation take?

A single-suite or small office is usually completed in 1-3 days. Larger commercial buildings, multifamily properties, or new construction pre-wire projects typically run 1-2 weeks depending on the number of drops and site access.

Does Gardient handle data center cabling as well as office and multifamily cabling?

Yes. Gardient designs and installs data center cabling, including high-density patch panel layouts and fiber backbones, in addition to standard office, multifamily, and new construction cabling projects.

Start Your Cabling Project

Get a free structured cabling quote for your property.

Get Free Quote